CAN/ULC edition tracker: published edition versus adopted edition

The edition of a CAN/ULC standard that is on sale is almost never the edition your job is built to. As of 5 September 2026 the current published installation standard is CAN/ULC 524:2024, the 8th edition, while both the Ontario Building Code and the Ontario Fire Code still designate CAN/ULC-S524:2019, and both still designate CAN/ULC-S1001-11 against a published 2nd edition dated 2026. This page tracks published edition against designated edition for thirteen standards and for every major provincial code, and it is re-checked and re-dated on each review.

Last updated September 2026 12 min read

Last updated: September 2026

Last checked: 5 September 2026. Every published edition below was read that day from the ULC Standards catalogue product page for that standard. Every Ontario designation was read from the free 2024 Building Code Compendium and from the Ontario Fire Code on e-Laws. This page is reviewed at least every three months and after any national or provincial code comes into force. Editions change. Confirm before you put a number in a compliance document.

Quick answer

  • The published edition and the adopted edition are two different things. A standard exists when ULC publishes it. It becomes a requirement only when a code designates it, by year, in a referenced-documents table.
  • The installation standard is the clearest example. The current published edition is CAN/ULC 524:2024, the 8th edition. Both Ontario codes still designate CAN/ULC-S524:2019.
  • The worst gap in the set is integrated testing. The current published edition is the 2nd edition (2026). Both Ontario codes still designate CAN/ULC-S1001-11, the 1st edition, from 2011.
  • Six of the thirteen standards are not designated by either Ontario code at all. They are pulled in one level down by S524 and S537 themselves.
  • Almost every province is now on a National Building Code 2020 base, but the in-force dates run from January 2024 to 2026, and Quebec is mid-transition until 17 October 2026.
  • The referenced-documents table is the answer. The article text says "CAN/ULC-S524" with no year. The year is in the table, and that is the number that governs.

Why the newest standard is almost never the one you build to

You buy the current standard, you read it, you build to it. That should be the end of it, and it is not, because a CAN/ULC standard is not law on its own. It becomes enforceable only when a building code or a fire code references it, and codes reference a specific edition frozen at the moment the code was written. Everything on this page follows from that one fact, which we cover in more depth in the adoption gap glossary entry.

So at any moment there are three different answers to "what does the standard say": what the newest published edition says, what the edition your code designated says, and what your authority having jurisdiction actually enforces. Those are frequently three different documents, and the differences are not cosmetic. The 2019 edition of S524 renumbered the whole standard and rewrote the fault tolerance rule. If you are quoting a clause from a different edition than the inspector is holding, you will not agree, and neither of you will be wrong.

Table 1: published edition versus Ontario's designated edition

Published editions read from the ULC Standards catalogue on 5 September 2026. Ontario Building Code designations from Division B Table 1.3.1.2 of the 2024 Building Code Compendium. Ontario Fire Code designations from Division B Table 1.2.1.A of O. Reg. 213/07 as consolidated on 1 January 2026.

StandardCoversCurrent published editionEd.First publishedLast revisedOntario Building CodeOntario Fire Code
CAN/ULC-S524InstallationCAN/ULC 524:20248th23 Dec 2024not revisedS524:2019S524-2019
CAN/ULC-S527Control units and accessoriesCAN/ULC 527:20245th9 Oct 202325 Oct 2024not designatednot designated
CAN/ULC-S528Manual stationsCAN/ULC 528:20243rd1 Oct 20148 Jul 2024not designatednot designated
CAN/ULC-S529Smoke detectorsCAN/ULC 529:20265th2 Jun 202316 Apr 2026not designatednot designated
CAN/ULC-S530Heat detectorsCAN/ULC 530:20252nd11 Dec 202424 Oct 2025not designatednot designated
CAN/ULC-S531Smoke alarmsCAN/ULC 531:20265th27 Nov 202414 Jan 2026S531:2019S531-2019
CAN/ULC-S536Inspection and testingCAN/ULC 536:20246th1 Aug 20195 Aug 2024not designatedS536-2019
CAN/ULC-S537VerificationCAN/ULC-S537:2019-REV16th1 Aug 20195 Apr 2021S537:2019S537-2019
CAN/ULC-S540Residential fire warning systemsCAN/ULC-S540-13-(R2023)2nd1 Mar 201314 Apr 2023S540-13not designated
CAN/ULC-S559Receiving centre equipmentCAN/ULC 559:20243rd22 Oct 20204 Oct 2024not designatednot designated
CAN/ULC-S561Receiving centre installation and servicesCAN/ULC 561:20243rd1 Jun 202022 Jul 2024S561-13S561-13
CAN/ULC-S573Ancillary devicesCAN/ULC 573:20261st28 Dec 201810 Jul 2026not designatednot designated
CAN/ULC-S1001Integrated systems testingCAN/ULC 1001:2026A2nd23 Mar 20264 Jun 2026S1001-11S1001-11

Four things in that table deserve a second look.

S536 and S537 are the same edition twice. The 6th edition of each was published on 1 August 2019, and that is the edition Ontario designates. But S536 was revised on 5 August 2024 and now sells as 536:2024, and S537 was revised on 5 April 2021 and now sells as S537:2019-REV1. So the document on the shelf and the document Ontario designated carry the same edition number and different content. Whether your AHJ treats the revision as part of the designated edition is a question worth asking out loud, because nothing in the Fire Code table answers it.

S1001 is the widest gap on the page. Both codes point at the 1st edition from 2011. The 2nd edition published on 23 March 2026 and was revised on 4 June 2026. That is a fifteen-year separation between what you can buy and what the code names, and it matters on any project with integrated systems testing in the scope.

S530 is no longer a 1991 document. For decades the heat detector standard was S530-M91, revised and reaffirmed. A 2nd edition published on 11 December 2024 and was revised on 24 October 2025. If you have read anywhere, including on this site before today, that the current heat detector standard dates from 1991, that is now out of date.

S540 is the one row where published and designated agree. The 2nd edition was published in 2013 and reaffirmed in 2023 without substantive change. The Building Code designates S540-13. Same document.

The six standards neither Ontario code designates

S527, S528, S529, S530, S559 and S573 appear nowhere in the Ontario Building Code's referenced-documents table and nowhere in the Ontario Fire Code's. That is not an oversight and it does not mean they are optional. They reach a job one level down, through S524 and S537, which reference them. It does mean that if somebody tells you "the Ontario Building Code requires S528 manual stations", they are describing the chain loosely at best.

We cannot tell you which editions of those six a job is held to, because the answer is inside S524:2019, which is copyrighted and paywalled. We have not read it and we are not going to guess. If you own a copy, its referenced-documents list is where you look.

Table 2: which code is in force where, and what it is built on

JurisdictionBuilding code in forceBase model codeFire code in forceIn force since
OntarioO. Reg. 163/24, the 2024 Building CodeNBC 2020 plus Ontario amendmentsO. Reg. 213/07, as amended by O. Reg. 87/25Building 1 Jan 2025, Fire 1 Jan 2026
British ColumbiaBC Building Code 2024NBC 2020BC Fire Code 20248 Mar 2024
AlbertaNational Building Code 2023 Alberta EditionNBC 2020National Fire Code 2023 Alberta Edition1 May 2024
QuebecConstruction Code ch. I Building, NBC 2020 amendedNBC 2020Safety Code ch. VIII BuildingIn force 17 Apr 2025, mandatory 17 Oct 2026
ManitobaManitoba Building Code, M.R. 78/2023NBC 2020Manitoba Fire Code, M.R. 82/20231 Jan 2024
SaskatchewanNBC 2020 adopted by regulationNBC 2020NFC 20201 Jan 2024
Nova ScotiaNova Scotia Building Code RegulationsNBC 2020under the Fire Safety Act, separately1 Apr 2025
New BrunswickNBC 2020, energy tier 2NBC 2020NFC 20201 May 2025
Prince Edward IslandNBC 2020NBC 2020NFC 2020 with NFPA 1 in places31 Mar 2024
Newfoundland and LabradorNBC 2025NBC 2025NFC 202512 Jul 2026

Ontario is the only row where we have read the designated CAN/ULC editions ourselves, in the two tables cited above. For the rest, the practical inference is that a jurisdiction on an NBC 2020 base inherits the 2019 editions of S524, S536 and S537, because that is the generation NBC 2020 was aligned to. We are stating that as an inference, not as something we read in each province's referenced-documents table, and it is exactly the kind of cell you should confirm before it goes into a report.

Alberta is the one province outside Ontario where a dated, government-published confirmation exists: Alberta moved to the 2019 edition of the inspection and testing standard effective 1 May 2024, ahead of Ontario by about twenty months. Our Alberta guide sets out the STANDATA behind that. The same detail for the other provinces is covered in the British Columbia, Quebec, Manitoba, Saskatchewan and Atlantic Canada guides, and the Ontario position is set out in the 2026 Fire Code guide.

Two rows carry live risk. Quebec is in transition. Work starting before 17 October 2026 may be built to either the NBC 2015 based chapter that came into force in January 2022 or the NBC 2020 based chapter that came into force on 17 April 2025. Two different sets of designated editions are legitimate in the same province on the same day, so the permit date decides. Newfoundland and Labrador has jumped a generation. It is the first jurisdiction to move to the 2025 national codes, effective 12 July 2026. We have not been able to establish which CAN/ULC editions the 2025 National Building Code designates, so that row is marked unconfirmed rather than filled in.

Why the gap exists: three clocks that never line up

The standards clock. ULC publishes when its technical committee finishes. There is no fixed cycle. S573 has been in its 1st edition since 2018 and has been revised four times. S1001 went fifteen years between editions. UL Canada also stopped issuing bulletins announcing standard adoptions, so nobody emails you when a new edition lands.

The model code clock. The National Building Code and National Fire Code ran on a five-year cycle, 2010, 2015, 2020, and the 2025 editions are now out. A model code freezes its referenced editions at the point of drafting, which is typically a year or two before publication. NBC 2020 was drafted against standards that existed in 2019.

The provincial clock. Each province then adopts the model code on its own schedule, which in this cycle ranged from January 2024 to 2026 for the same NBC 2020. Ontario adds a fourth complication, because its Building Code and its Fire Code are separate instruments amended independently, and for years they designated different editions of the same standard. They finally agree on the 2019 editions of S524 and S537, which is worth knowing if you learned this trade when they did not.

Stack the three and a standard published in December 2024 has, realistically, a three to seven year wait before it is designated anywhere.

How to check any of this yourself, for free

Find the referenced-documents table, not the article. In a National Building Code and in every code built on it, including Ontario's, it is Table 1.3.1.2 in Division B, Part 1, titled Documents Referenced in Division B. In the Ontario Fire Code it is Table 1.2.1.A in Division B. That table has three columns: the issuing agency, the document number including its edition year, and the title.

Read the year in the table, never the article. Ontario's Article 3.2.4.5 says fire alarm systems shall be installed in conformance with CAN/ULC-S524, with no year attached. If you stop there you have learned nothing about which edition governs. The year is in the table, and the table is the operative instruction.

Where to get each document at no cost. Ontario's free 2024 Building Code Compendium is at publications.gov.on.ca. The Ontario Fire Code is on e-Laws. The National Building Code and National Fire Code are free from the NRC publications archive. The CAN/ULC standards themselves are not free and never have been, which is why so much bad information circulates about what is in them.

A supplier's word is not a source. Distributors sell against the current published edition, because that is what is in stock and what the manufacturer certified to. That is a reasonable commercial position and it tells you nothing about what your permit is assessed against. Nor does a data sheet reading "listed to CAN/ULC 529:2026". Listing is a product question. Designation is a code question.

What to do when your AHJ says otherwise

The AHJ's adopted edition governs, full stop. If the inspector is working from the edition the code designates and you are working from the edition you bought last month, the inspector is right and you have a rework item.

A specification can require a newer edition than the code, and that binds you as contract rather than as code. If the consultant wrote CAN/ULC 524:2024 into the spec, you owe them 524:2024 whether or not any code has adopted it. A spec cannot go the other way and let you build to less than the designated edition.

Permit date usually decides. Work is generally assessed against the code in force when the permit was issued, not the code in force when you got to site. On a long project that can mean the designated edition changed under you and does not apply to your scope.

Write the edition into your own paperwork. "Verified in accordance with CAN/ULC-S537:2019" is a statement someone can check. "Verified in accordance with CAN/ULC-S537" is not.

Both designation formats are correct

You will see the same standard written three ways: CAN/ULC-S524-14 with separate -AMD1 and -REV1 documents, then CAN/ULC-S537:2019 with the colon and the "S" retained, then CAN/ULC 524:2024 with the "S" dropped. The "S" has gone from most of the family but not all of it, which is why both forms appear in Table 1. Underneath the cosmetics is one real change: UL Canada now treats every amendment as a new edition instead of issuing standalone amendment documents. That is how a standard carries a 2024 designation while its edition number has not moved since 2014, which is exactly what happened to S528.

How this page differs from our other two edition pages

Which edition of the standard applies to your job explains the mechanism and how to reason about it. Which CAN/ULC edition does my province use is the lookup by jurisdiction. This page is the maintained data behind both: the numbers, the dates, the sources and the date they were last checked. If the three ever disagree, this one was checked most recently. What each standard actually covers is in the S524, S537, S536 and S1001 guide.

What we could not confirm

Which CAN/ULC editions the National Building Code 2020 designates, read from its own table. We have Ontario's Table 1.3.1.2, and Ontario's Building Code is NBC 2020 plus Ontario amendments, so the 2019 editions are almost certainly the national position. We could not open the NBC's own Division B table to prove it, and Ontario amends, so we have not asserted it as read.

Which CAN/ULC editions the National Building Code 2025 designates. Not established. That leaves Newfoundland and Labrador's row incomplete, and it will matter more as other provinces move to the 2025 codes.

The editions of S527, S528, S529, S530, S559 and S573 that apply on a job. They come through S524 and S537, both paywalled. Unread, so unstated.

Fire code designations outside Ontario. We have the codes in force and their model code base for every province listed. We have read a referenced-documents table for none of them. Treat those cells as the base code, not as a verified edition list.

Whether any Canadian code has yet designated CAN/ULC 524:2024. We looked and found none. If you know of one, tell us and we will correct this page and date the correction.

General information, not compliance advice. Confirm the designated edition with your authority having jurisdiction before relying on it. CAN/ULC standards are copyrighted and available from UL Standards & Engagement and authorised resellers, and no text from any standard is reproduced here.


Fire Alarm Academy provides educational content only. It does not confer any certification, licence or credential, and it is not affiliated with, endorsed by, or accredited by the Canadian Fire Alarm Association, the Electrical Contractors Association of Ontario, ULC Standards, UL Standards and Engagement, CSA Group, the Electrical Safety Authority, any authority having jurisdiction, or any manufacturer. Always work from the edition of any standard adopted by your authority having jurisdiction.

Frequently asked questions

Which edition of CAN/ULC-S524 do I actually have to build to?

The one your code designates, which in Ontario is CAN/ULC-S524:2019 under both the Building Code and the Fire Code. The current published edition is CAN/ULC 524:2024, the 8th edition, and we could not find any Canadian code that has designated it yet.

Where in the code do I find which edition is adopted?

In Table 1.3.1.2 of Division B in the Ontario Building Code and any National Building Code based code, and in Table 1.2.1.A of Division B in the Ontario Fire Code. The article text itself, such as Article 3.2.4.5, names the standard with no year. The year is only in the table.

Is CAN/ULC 536:2024 the same thing as the 2019 edition my Fire Code names?

Same edition number, different document. The 6th edition was published on 1 August 2019 and revised on 5 August 2024, and the revision now sells as 536:2024. Ontario designates the 2019 form. Ask your AHJ whether they treat the 2024 revision as included.

Why does the code still point at a standard from 2011?

Because CAN/ULC-S1001-11 was the only edition in existence when the model codes were drafted, and the 2nd edition did not publish until 23 March 2026. Until a code is amended to designate it, the 2011 edition governs.

My province is on the National Building Code 2020. Which CAN/ULC editions is that?

The 2019 generation of S524, S536 and S537, which is what NBC 2020 was aligned to. We have verified that from Ontario's own referenced-documents tables but not from each province's, so confirm it in your provincial code before you put it in a compliance document.

Does the S disappearing from the designation mean it is a different standard?

No. CAN/ULC-S524 and CAN/ULC 524 are the same standard under an old and a new naming convention. What is different is the year: 524:2024 and S524:2019 are separate editions with real technical differences.

The spec calls for a newer edition than the code. Which one wins?

You owe the newer one, as a contract obligation rather than a code obligation. A specification can require more than the designated edition. It cannot let you build to less than it.

How often is this page checked?

At least every three months, and after any national or provincial code comes into force. The last-checked date is at the top of the page. If a cell here disagrees with your AHJ, the AHJ is right and we would like to know so we can fix it.

Sources

Related guides

Which Edition of the Standard Actually Applies to Your Job?

The newest published standard is almost never the one you build to. CAN/ULC 524:2024 (the 8th edition of the installation standard) was published in December 2024. The codes in force across Canada still reference the 2019 editions, and Ontario only reached the 2019 editions of S536 and S537 on 1 January 2026. Citing "CAN/ULC-S524" with no edition in a compliance document means nothing. The edition that governs is the one your authority having jurisdiction has adopted.

Which CAN/ULC Edition Has Your AHJ Adopted? A Province-by-Province Lookup

The edition that applies is the one your code table designates, and it is almost never the newest published. Ontario designates CAN/ULC-S524:2019 and S537:2019 in the Building Code, and S524-2019, S536-2019 and S537-2019 in the Fire Code. Alberta designates the same 2019 editions under the NBC and NFC 2023 Alberta Editions, both in force 1 May 2024. Quebec's Code de construction, in force 17 April 2025, designates CAN/ULC-S524:2019; the Code de sécurité cites S524 with no edition year, resolved through articles 1.05 and 343. Neither regulation mentions S536 or S537 anywhere. British Columbia's 2024 codes came into force 8 March 2024, but we have not verified which CAN/ULC editions they reference and will not guess. The 2024 and 2026 editions of S524, S536 and S1001 are published; none of them appears in any of these tables.

CAN/ULC-S524, S537, S536 and S1001: What Each Standard Actually Covers

Canada splits fire alarm work across four separate standards where the American system uses one. S524 governs installation. S537 governs verification, a one-time event that proves the install matches the design. S536 governs periodic inspection and testing, forever after. S1001 governs integrated testing, where the fire alarm has to talk to other building systems. Confusing verification with inspection is the most expensive mistake in Canadian fire alarm work, and it happens constantly.

Canadian Fire Alarm Code Updates: What Changed and When

Ontario's fire alarm code has changed more in the last twenty months than in the decade before it. The Building Code was revoked and replaced on 1 January 2025, Subsection 3.2.4 was renumbered to match NBC 2020 (a shift of 0, one or two articles depending on where it sits, not a flat two) and low frequency signals in sleeping rooms became a requirement for the first time. The Fire Code moved to the 2019 ULC editions on 1 January 2026. Four Building Code amendments since are not listed on Ontario's own updates page. This is the dated log, newest first, maintained as things change.

Fire Alarm Academy

Canadian fire alarm training built on CAN/ULC standards and the Ontario codes, taught by a licensed 309A electrician who does the work.

Learn

Free Resources

Company

Disclaimer: Fire Alarm Academy is an educational course. It is not a certification, licence, or accredited program, and it is not affiliated with or endorsed by the Canadian Fire Alarm Association, ECAO, ULC Standards, or any authority having jurisdiction. Course content does not replace the CAN/ULC standards, the Canadian Electrical Code, the applicable building or fire code, manufacturer instructions, or the direction of your AHJ. Always verify against the edition adopted in your jurisdiction.

© 2026 Fire Alarm Academy. Built for the trade.